For building managers

You're doing the work. It just isn't visible.

Here's a scene that will be familiar.

You are in the foyer. An owner stops you and asks, with an edge, why nothing has been done about the garage door. You know exactly what's been done about the garage door. You called two techs, one didn't turn up, the second quoted $2,800, you sent it to the chair eight days ago, and you haven't heard back.

You can't say most of that out loud. So you say "it's with the committee," which sounds exactly like what someone says when nothing is happening.

You've just been made responsible for a delay you don't control, in a conversation you can't win, over work you actually did.

That's the job. But it doesn't have to be.

The real problem isn't workload. It's evidence.

A building manager running a mid-sized scheme is carrying thirty to fifty live jobs at any moment. That's manageable, it's the job, and you're good at it.

The problem is where the evidence of those jobs lives.

A bit in your phone's SMS. A bit in an email thread with one contractor. A bit on the whiteboard in the office. A bit in a notebook. A bit in your head, which is honestly the largest and most reliable database in the building and also the only one that goes home at 5pm and takes annual leave.

Which means that when the value of your work is questioned, at renewal, at the AGM, in a foyer conversation with an owner who's had a bad week, you cannot produce it. You can describe it. Describing is not the same as showing, and everybody in the room knows it.

You are doing the work of three people and you can prove roughly none of it.

The three places the days actually go

Not one of these is the BM being slow.

One: the report that was never a record. Someone tells you about the light in stairwell B while you're carrying something. It goes into your head. Your head is at 94% capacity. Three weeks later the same person asks why nothing's happened, and now you're the one who forgot, even though you were never given anything to forget.

Two: the quote in someone's inbox. You send it to the committee. Now it's out of your hands, but not out of your responsibility, because residents don't distinguish. It sits in a thread where two of the five members were cc'd and don't consider themselves asked. Nobody says no. Nobody says yes. The quote expires. You get to ring the contractor and ask for it again, and hear the tone in their voice.

Three: the wait for a decision. In Queensland the committee can vote outside a meeting, the secretary notifies all committee members and all owners in writing at once, and members have 21 days to return written votes. The mechanism exists. But if nobody starts it, the job waits for the next scheduled meeting, and there's nothing you can do except hold a contractor and absorb the questions.

You are being measured on a clock that three other people control and nobody is looking at.

Transparency is not exposure. For you, it's the opposite.

Fair warning that the word gets used against people in your position. "More transparency" often arrives in a room already meaning "we suspect the BM."

So here's the reframe, and it matters. A defined, visible maintenance record is the single best thing a building manager can own, not because it satisfies a committee, but because it's the only form your work exists in.

Think about what a complete record says about you at renewal time.

It says: 214 items handled this year, average 9 days from report to resolution. It says: of the eleven items currently open, seven are waiting on a committee decision, and here are the dates they were sent. It says: here's the recurring cost pattern in the east lifts, which I flagged in March.

Versus what most BMs can offer, which is: "I've been flat out, mate."

You're being paid on the second version of that sentence when you've earned the first.

And there's a second thing nobody enjoys saying. If you got hit by a bus on Friday, this building would lose most of its operational memory, not because you hoarded it, but because nobody gave you anywhere to put it. Every honest committee knows that's a risk to the scheme. A building that can survive your absence is also a building that can afford to give you a holiday.

The version we built

I run NaloHub. It's a resident portal, not a strata management platform, it doesn't replace the body corporate manager and it doesn't want your trust accounting. It's built around the thing you actually do all day.

Six stages. Everything you're already doing, named, with buttons.

Reported. Residents log it in the portal with a photo and a location, so it starts as a record instead of a rumour in a stairwell. You can also enter historical items with their real original dates, so your aging and average-resolution figures are honest from day one rather than pretending the building started the week you signed up.

Triaged. You set urgency, category, and whether it's common property or lot owner. That call is yours and now it's visible and dated, which matters, because half the disputes in strata are about exactly that line.

Quotes in. Attach them to the job, not to an email. Both quotes if it's over the major spending threshold (in Queensland, by default, lots × $1,100, capped at $10,000), because if it's heading for a resolution they have to go out with the notice anyway. One quote is only acceptable in genuinely exceptional cases, a sole supplier, and you want the reason on the record when it happens.

Recommended. Your view, on the record. This is the stage most BMs skip and it's the most valuable one you have. "Recommend Harrison at $2,800, higher, but they hold the door parts locally and can be here Thursday." That sentence is you doing the job the committee actually needs done. It also means that if they choose otherwise, that's their decision, dated.

At vote. One button, Send to vote. The motion is created straight from the job and stays linked to it. Every committee member sees it at once; nobody is merely cc'd. They vote from a phone in about twenty seconds and can attach a question, a comment, or a condition of approval. The moment the required majority is reached it executes itself, and the outcome stays attached to the job.

You stop being the person chasing a decision. You're the person who sent it, on a date, visible to everyone. (It runs and records the committee's decision, the secretary still handles owner notice and the record of the motion.)

Contractor confirmed, then Resolved. Scheduled, done, closed, with cost and what was actually found.

Every stage change is stamped with who moved it and when. Not surveillance, the opposite. It's the difference between "I sent that weeks ago" and "sent 8 July, awaiting decision, day 11."

The report that ends the argument

Pick a date range, click one button, get a Word document: every issue, its updates, quotes, approved works, committee decision, the full trail, embedded photos, status chips and age.

Minute-ready. Hand it to the committee before the meeting instead of narrating it during the meeting. Hand it to the chair at renewal instead of a feeling.

That document is the thing that turns "I've been flat out" into evidence.

What changes

Residents stop asking you. They chase because silence reads as nothing. Show them their report is at "waiting on second quote" and they leave you alone. The visible job is chased less than the invisible one, every single time.

Delays go where they belong. "Nine of fourteen open items are with the committee, oldest 31 days" isn't an accusation. It's a fact that changes behaviour the moment it's on a page.

Meetings get shorter, because the record is the report.

Renewal gets easier, because you walk in with a year of evidence.

None of this requires you to work differently. It requires the work to leave a trace.

There's a live demo building at demo.nalohub.com, no signup. Have a proper go at it and tell me what your building does that it doesn't handle. That feedback is worth more to me than a sign-up.

But first, what's your worst one?

I'd like to hear the job in your building that took far longer than it should have, and honestly where it got stuck. Not to blame a committee. To map it. The quote that expired waiting on a reply. The contractor you had to apologise to. The item raised at an AGM that you'd resolved four months earlier and couldn't prove. The thing you fixed at 9pm on a Sunday that nobody will ever know about.

Email me at info@nalohub.com. I'm trying to work out how many buildings are losing time in exactly the same three places, and whether it's the same three everywhere.

🌊 Be in the Nalo.

See it in a real building

There's a fully populated demo building at demo.nalohub.com, no signup, nothing to install. Have a proper look.

Open the demo →

More from NaloHub

What your building forgets every time the committee changesFor committees · 5 August 2026 You're allowed to ask. You're also allowed to check.For owners & residents · 5 August 2026 The deadlines nobody hands a new committeeFor committees & building managers · 5 August 2026